|  | 曹振新, 朱云龙, 宋崎.  制造系统的设备布局方. 辽宁工程技术大学学报, 2005. 24 (3): 413- 416. doi: 10.3969/j.issn.1008-0562.2005.03.034
 | 
																													
																						|  | Cao Z X ,  Zhu Y L ,  Song Q .  The research on facilities layout for manufacturing systems. Journal of Liaoning Technical University, 2005. 24 (3): 413- 416. doi: 10.3969/j.issn.1008-0562.2005.03.034
 | 
																													
																						|  | 陈伟达, 林晶晶.  基于DBR的再制造系统缓冲设置模型研究. 科研管理, 2010. 31 (5): 108- 115, 156. | 
																													
																						|  | Chen W D ,  Lin J J .  Research on the model of buffer design based on DBR for remanufacturing system. Science Research Management, 2010. 31 (5): 108- 115, 156. | 
																													
																						|  | 葛安华, 隋姗姗, 刘栋.  基于Flexsim软件的鼓风机叶轮加工系统仿真. 森林工程, 2007. 23 (4): 30- 32. doi: 10.3969/j.issn.1001-005X.2007.04.010
 | 
																													
																						|  | Ge A H ,  Sui S S ,  Liu D .  Simulation of blower impeller machining system based on Flexsim software. Forest Engineering, 2007. 23 (4): 30- 32. doi: 10.3969/j.issn.1001-005X.2007.04.010
 | 
																													
																						|  | 管在林, 刘俊良, 马力, 等.  多品种小批量生产环境下基于约束管理的混流制造运行控制技术研究. 现代制造工程, 2007. (4): 1- 5. doi: 10.3969/j.issn.1671-3133.2007.04.001
 | 
																													
																						|  | Guan Z L ,  Liu J L ,  Ma L , et al.  Research on constraints management-based operation and control of flow manufacturing in high mix and low volume production environments. Modern Manufacturing Engineering, 2007. (4): 1- 5. doi: 10.3969/j.issn.1671-3133.2007.04.001
 | 
																													
																						|  | 季学金.  精益生产在多品种小批量生产企业的应用. 机械工人, 2005. (7): 29- 32. | 
																													
																						|  | Ji X J .  Lean production in a variety of small batch production enterprises. Mechanical Workers, 2005. (7): 29- 32. | 
																													
																						|  | 马云, 李跃宇.  混流生产线的Flexsim仿真应用研究. 微计算机信息, 2009. 25 (1): 232- 234. | 
																													
																						|  | Ma Y ,  Li Y Y .  Research on Flexsim simulation application of mixed flow production line. Microcomputer Information, 2009. 25 (1): 232- 234. | 
																													
																						|  | 孙军艳, 韩昉, 曹西京.  基于Flexsim的车间设备布局优化设计. 起重运输机械, 2008. (9): 31- 33. doi: 10.3969/j.issn.1001-0785.2008.09.009
 | 
																													
																						|  | Sun J Y ,  Han F ,  Cao X J .  Optimized layout design of workshop equipment based on Flexsim. Hoisting and Conveying Machinery, 2008. (9): 31- 33. doi: 10.3969/j.issn.1001-0785.2008.09.009
 | 
																													
																						|  | 徐学军, 张红, 叶广宇.  生产进度的同步化方法研究. 工业工程与管理, 2001. (2): 38- 41. doi: 10.3969/j.issn.1007-5429.2001.02.010
 | 
																													
																						|  | Xu X J ,  Zhang H ,  Ye G Y .  A Study on synchronous production schedule. Industrial Engineering and Management, 2001. (2): 38- 41. doi: 10.3969/j.issn.1007-5429.2001.02.010
 | 
																													
																						|  | 叶明春.  生产计划与控制. 北京: 高等教育出版社. 2005. 406- 411. | 
																													
																						|  | Ye M C .  Production planning and control. Beijing: Higher Education Press. 2005. 406- 411. | 
																													
																						|  | 尹静, 马常松.  Flexsim物流系统建模与仿真. 北京: 冶金工业出版社. 2014. 18- 24. | 
																													
																						|  | Yin J ,  Ma C S .  Flexsim logistics system modeling and simulation. Beijing: Metallurgical Industry Press. 2014. 18- 24. | 
																													
																						|  | 张鹏.  基于OPT的车间作业计划中瓶颈识别问题的研究与系统实现. 沈阳师范大学学报:自然科学版, 2009. 27 (3): 338- 341. | 
																													
																						|  | Zhang P .  Research and realization of "bottleneck" identification in workshop production scheduling based on OPT. Journal of Shenyang Normal University:Natural Science Edition, 2009. 27 (3): 338- 341. | 
																													
																						|  | 张卫德, 严洪森, 徐成.  基于FlexSim的生产线仿真和应用. 工业控制计算机, 2005. 18 (9): 50- 51. doi: 10.3969/j.issn.1001-182X.2005.09.026
 | 
																													
																						|  | Zhang W D ,  Yan H S ,  Xu C .  Production line simulation and application based on FlexSim. Industrial Control Computer, 2005. 18 (9): 50- 51. doi: 10.3969/j.issn.1001-182X.2005.09.026
 | 
																													
																						|  | 朱小蓉.  基于FlexSim的仓储作业系统仿真及优化. 物流技术, 2012. 31 (2): 135- 137. doi: 10.3969/j.issn.1005-152X.2012.02.042
 | 
																													
																						|  | Zhu X R .  Simulation and optimization of warehousing operation system based on FlexSim. Logistics Technology, 2012. 31 (2): 135- 137. doi: 10.3969/j.issn.1005-152X.2012.02.042
 | 
																													
																						|  | Schrageheim E ,  Ronen B .  Drum-buffer-rope shop floor control. Production and Inventory Management Journal, 1990. 3, 18- 22. | 
																													
																						|  | Sivasubramanian R ,  Selladurai V ,  Rajamramasamy N .  The effect of the drum-buffer-rope (DBR) approach on the performance of a synchronous manufacturing system (SMS). Production Planning & Control, 2000. 11 (8): 820- 824. | 
																													
																						|  | Srinivas C ,  Satyanarayana B .  Determination of buffer size in single and multi row flexible manufacturing systems through simulation. International Journal of Engineering Science and Technology, 2011. 3 (5): 3889- 3899. | 
																													
																						|  | Wang Y C .  The work in process(WIP)control model and its application simulation in small-batch and multi-varieties production mode. Modern Applied Science, 2009. 3 (6): 83- 87. |