欢迎访问林业科学,今天是

›› 1997, Vol. 33 ›› Issue (zk2): 36-46.

• 论文及研究报告 • 上一篇    下一篇

杉木林集水区人为干扰的径流动态模拟

张合平 田大伦   

  1. 中南林学院 株洲412006
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:1997-11-25 发布日期:1997-11-25

SIMULATION OF RUNOFF DYNAMICS IN CHINESE FIR WATERSHEDS UNDER ARTIFICIAL DISTURBANCE

Zhang Heping,Tian Dalun   

  1. Central—south Forestry College Zhuzhou 412006
  • Received:1900-01-01 Revised:1900-01-01 Online:1997-11-25 Published:1997-11-25

摘要: 根据杉木林集水区人为干扰前后连续定位观测资料,结合森林流域的特点,运用蓄满产流模型,分析杉木林集水区产汇流特征和机理,并对皆伐和间伐后径流动态进行对比研究。该模型具有较高的精度,并能精确地将壤中流从径流过程线中与地下水分割开来,皆伐区和间伐区以天为单位的模拟效率分别为95.7%和92.3%。杉木林冠和下层植被持水能力为1—2mm之间,经林冠截留后的净降雨在表土的渗透速度达3.0—14.Omm/min之间,地表径流在坡面汇流过程中大部分转变为壤中流和地下水。模拟结果表明,杉木皆伐后,包气带蓄水能力降低,壤中流汇流时间提前,地下水下渗速度减慢,暴雨总径流量增加18%;间伐后,包气带蓄水能力下降,壤中流汇流时间稍有提前,地下水下渗速度加快,调蓄作用比皆伐区大。杉木林生态系统通过地上部分调蓄、直接径流转化为地下径流、延缓壤中流汇流时间,达到减少洪水流量、降低洪峰、延长流时的效果。

关键词: 杉木人工林, 集水区, 人为干扰, 径流, 模型

Abstract: Basde on observations from Chinese fir watersheds before and after artificial distur-bance,“excess storage model”was developed in the light of specific conditions of forest watersheds,the features and mechanisms of runoff yield and confluence analyzed and a comparative study of runoff dynamics under the influence of clearcutting and thinning made.The model was of high accuracy by which interflow could be prceisely separated from groundwater flow.The accuracy of modelling runoff at one—day intervals was 95.7% in the clearcutting watershed and 92.3% in the thinning watershed.The water holding capacity of crown and undergrowth amounted to more than 1—2mm.The final infiltration rate of surface water was 3.4—14.Omm/min.,most of which then turned in-to interflow and groundwater,while surfaceflow was only 0.4% of total runoff.Simula-tion results showed that after clearcutting the storage capacity in the zone of aeration de-creased,time of throughflow concentration shortened,final infiltration capacity of groundwater dropped,and total storm runoff increased,while after thinning the water holding capacity in the zone of aeration decreased,time of throughflow concentration shortened slightly,infiltration rate of groundwater increased,thus its effect of storage control was greater than that in the clearcut watershed.The Chinese fir plantation reduces the flood flow and peak flow,and prolongs the time of concentration by means of aboveground storage control,transformation of direct runoff into groundwater and delay of throughflow confluence.

Key words: Chinese fir, Watershed, Artificial disturbance, Runoff, Modelling